ITAC Assessment: AM0957
ITAC logo
ITAC Assessment: AM0957
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Personal Care Products, Deodorants, Skincare Products
NAICS 325620: Toilet Preparation Manufacturing
SIC 2844: Perfumes, Cosmetics, and Other Toilet Preparations
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 115,000
ft2
Annual Production 100,000,000
units
Production Hrs. Annual 4,728
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $77,338 1,533,195
kWh
Electricity Demand $34,655 3,467
kW-mo/yr
Electricity Fees $2,950 -
TOTAL YEARLY COSTS $114,943
RECOMMENDED SAVINGS* $144,209 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.2511: Insulate bare equipment $37,593 $4,073 $20,823
413,160
kWh
$16,770
-
kW-mo/yr
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,182 $515 $640
12,700
kWh
$403
-
kW-mo/yr
- $139
03 2.2533: Replace air curtain doors with solid doors $2,190 $1,291 $2,190
43,500
kWh
- - -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $14,464 $14,738 $14,297
283,680
kWh
$11,514
-
kW-mo/yr
$(-11,347.0)
-
MMBtu
-
05 2.9114: Use solar heat to make electricty $88,780 $684,984 $88,780
1,107,965
kWh
- - -
TOTAL RECOMMENDED $144,209 $705,601 $126,730
1,861,005
kWh
$28,687
-
kW-mo/yr
$(-11,347.0)
-
MMBtu
$139
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs