Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

396

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
NL0082 #06 Y:2023 Utilize energy-efficient belts and other improved mechanisms $314 $881
NL0082 #05 Y:2023 Utilize higher efficiency lamps and/or ballasts $365 $1,917
NL0082 #04 Y:2023 Eliminate leaks in inert gas and compressed air lines/ valves $1,690 $2,500
NL0082 #03 Y:2023 Eliminate or reduce compressed air usage $2,917 $6,850
NL0082 #02 Y:2023 Adjust / maintain fork lift trucks for most efficient operation $14,674 $80,927
NL0082 #01 Y:2023 Use or replace with energy efficient substitutes $676,628 $1,200,000
NL0077 #06 Y:2023 Close holes and openings in building such as broken windows $527 $200
NL0077 #05 Y:2023 Reduce space conditioning during non-working hours $1,997 $470
NL0077 #04 Y:2023 Eliminate leaks in inert gas and compressed air lines/ valves $7,279 $4,500
NL0077 #03 Y:2023 Recharge batteries on during off-peak demand periods $36,689 $350
NL0077 #02 Y:2023 Train operators for maximum operating efficiency $121,895 $4,200
NL0077 #01 Y:2023 Replace old machine with new automatic multi-station tool $150,762 $690,000
NL0062 #07 Y:2021 Air condition only space necessary $424 $50,000
NL0062 #06 Y:2021 Install compressor air intakes in coolest locations $1,261 $918
NL0062 #05 Y:2021 Recover and reuse waste material $1,313 $440
NL0062 #04 Y:2021 Eliminate leaks in inert gas and compressed air lines/ valves $1,413 $660
NL0062 #03 Y:2021 Utilize higher efficiency lamps and/or ballasts $4,498 $18,517
NL0062 #02 Y:2021 Change procedures / equipment / operating conditions $9,581 $24,336
NL0062 #01 Y:2021 Burn fossil fuel to produce steam to drive a steam turbine-generator and use steam exhaust for heat $45,354 $242,300
NL0060 #03 Y:2021 Install compressor air intakes in coolest locations $908 $1,790