402
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| NL0125 #06 Y:2025 | 06 | 2025 | Eliminate leaks in inert gas and compressed air lines/ valves | $2,881 | $3,000 |
n/a
|
| NL0125 #05 Y:2025 | 05 | 2025 | Use waste heat from hot flue gases to preheat | $184,176 | $1,561,000 |
n/a
|
| NL0125 #04 Y:2025 | 04 | 2025 | Use continuous processing | $515,427 | $123,656 |
n/a
|
| NL0125 #03 Y:2025 | 03 | 2025 | Reduce fluid flow rates | $862,950 | $672,300 |
n/a
|
| NL0125 #02 Y:2025 | 02 | 2025 | Add/modify equipment to improve drying process | $900,000 | $1,200,000 |
n/a
|
| NL0125 #01 Y:2025 | 01 | 2025 | Consolidate freight shipments and/or deliveries | $1,437,264 | $600,000 |
n/a
|
| NL0082 #06 Y:2023 | 06 | 2023 | Utilize energy-efficient belts and other improved mechanisms | $314 | $881 | |
| NL0082 #05 Y:2023 | 05 | 2023 | Utilize higher efficiency lamps and/or ballasts | $365 | $1,917 | |
| NL0082 #04 Y:2023 | 04 | 2023 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,690 | $2,500 | |
| NL0082 #03 Y:2023 | 03 | 2023 | Eliminate or reduce compressed air usage | $2,917 | $6,850 | |
| NL0082 #02 Y:2023 | 02 | 2023 | Adjust / maintain fork lift trucks for most efficient operation | $14,674 | $80,927 | |
| NL0082 #01 Y:2023 | 01 | 2023 | Use or replace with energy efficient substitutes | $676,628 | $1,200,000 | |
| NL0077 #06 Y:2023 | 06 | 2023 | Close holes and openings in building such as broken windows | $527 | $200 | |
| NL0077 #05 Y:2023 | 05 | 2023 | Reduce space conditioning during non-working hours | $1,997 | $470 | |
| NL0077 #04 Y:2023 | 04 | 2023 | Eliminate leaks in inert gas and compressed air lines/ valves | $7,279 | $4,500 | |
| NL0077 #03 Y:2023 | 03 | 2023 | Recharge batteries on during off-peak demand periods | $36,689 | $350 | |
| NL0077 #02 Y:2023 | 02 | 2023 | Train operators for maximum operating efficiency | $121,895 | $4,200 | |
| NL0077 #01 Y:2023 | 01 | 2023 | Replace old machine with new automatic multi-station tool | $150,762 | $690,000 | |
| NL0062 #07 Y:2021 | 07 | 2021 | Air condition only space necessary | $424 | $50,000 | |
| NL0062 #06 Y:2021 | 06 | 2021 | Install compressor air intakes in coolest locations | $1,261 | $918 |