ITAC Assessment: NL0060
ITAC logo
ITAC Assessment: NL0060
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Treated Wastewater
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range $1
M
to 5
M
# of Employees 5
Plant Area 310,000
ft2
Annual Production 693,500
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) South Dakota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $58,720 1,330,400
kWh
Electricity Demand $32,916 2,351
kW-mo/yr
Electricity Fees $366 -
Natural Gas $33,747 6,850
MMBtu
Waste Disposal Costs
Water Usage $5,266 844
Tgal
TOTAL YEARLY COSTS $131,015
RECOMMENDED SAVINGS* $7,666 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,666

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.6231: Utilize controls to operate equipment only when needed $4,780 $6,000 $4,780
108,642
kWh
- - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,978 $8,057 $880
19,997
kWh
$1,014
-
kW-mo/yr
$84 -
03 2.4221: Install compressor air intakes in coolest locations $908 $1,790 $1,208
27,446
kWh
- $(-200.0) $(-100.0)
TOTAL RECOMMENDED $7,666 $15,847 $6,868
156,085
kWh
$1,014
-
kW-mo/yr
$(-116.0) $(-100.0)
TOTAL IMPLEMENTED $7,666 $15,847 $6,868
156,085
kWh
$1,014
-
kW-mo/yr
$(-116.0) $(-100.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs