Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,964

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
OK1178 #05 Y:2026 Clean and maintain refrigerant condensers and towers $5,237 $4,365
OK1178 #04 Y:2026 Install occupancy sensors $11,237 $3,916
OK1178 #03 Y:2026 Utilize higher efficiency lamps and/or ballasts $11,495 $42,458
OK1178 #02 Y:2026 Optimize plant power factor $1,207 $2,699
OK1178 #01 Y:2026 Use solar heat to make electricty $19,887 $289,920
OK1177 #03 Y:2026 Utilize higher efficiency lamps and/or ballasts $26,608 $15,039
OK1177 #02 Y:2026 Replace existing hvac unit with high efficiency model $2,714 $5,280
OK1177 #01 Y:2026 Use solar heat to make electricty $80,220 $823,680
OK1175 #05 Y:2026 Conserve energy by efficient use of vending machines $168 $248
OK1175 #04 Y:2026 Clean and maintain refrigerant condensers and towers $530 $964
OK1175 #03 Y:2026 Use computer programs to optimize hvac performance $3,749 $19,250
OK1175 #02 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $1,605 $277
OK1175 #01 Y:2026 Use solar heat to make electricty $9,655 $117,936
OK1174 #06 Y:2026 Conserve energy by efficient use of vending machines $587 $360
OK1174 #05 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $3,885 $3,437
OK1174 #04 Y:2026 Reduce the pressure of compressed air to the minimum required $497 -
OK1174 #03 Y:2026 Utilize higher efficiency lamps and/or ballasts $1,188 $4,137
OK1174 #02 Y:2026 Install occupancy sensors $1,352 $1,200
OK1174 #01 Y:2026 Use solar heat to make electricty $43,875 $317,462
OK1173 #04 Y:2026 Use or replace with energy efficient substitutes $4,108 $19,620