| Assessment Year | 2026 |
|---|---|
| Principal Product | fuel filters |
| NAICS | 333999: All Other Miscellaneous General Purpose Machinery Manufacturing |
| SIC | 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified |
| Sales Range | $100 M to 500M |
| # of Employees | 135 |
| Plant Area |
54,000
ft2
|
| Annual Production | 573,591
units
|
| Production Hrs. Annual | 4,000
hrs
|
| Location (State) | Oklahoma |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $302,947 | 2,899,808 |
kWh
|
$0.10 | |
| Electricity Demand | $37,625 | 8,853 |
kW-mo/yr
|
$4.25 | |
| Natural Gas | $158,305 | 16,315 |
MMBtu
|
$9.70 | |
| Waste Disposal Costs | |||||
| Water Usage | $27,846 | 1,534 |
Tgal
|
$18.15 | |
| Water Disposal | $5,173 | 1,534 |
Tgal
|
$3.37 | |
| TOTAL YEARLY COSTS | $531,896 | ||||
| RECOMMENDED SAVINGS* | $51,384 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings |
|---|---|---|---|---|---|
| 01 | 2.9114: Use solar heat to make electricty | $43,875 | $369,564 |
$43,875
421,877
kWh
|
|
| 02 | 2.7135: Install occupancy sensors | $1,352 | $1,200 |
$1,352
12,996
kWh
|
|
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,188 | $4,137 |
$1,188
11,424
kWh
|
|
| 04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $497 | - |
$497
4,774
kWh
|
|
| 05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $3,885 | $3,437 |
$3,885
37,358
kWh
|
|
| 06 | 2.6211: Conserve energy by efficient use of vending machines | $587 | $360 |
$587
5,641
kWh
|
|
| TOTAL RECOMMENDED | $51,384 | $378,698 |
$51,384
494,070
kWh
|
||
| TOTAL IMPLEMENTED | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs