Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

894

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MA0859 #06 Y:2023 Recover waste heat from equipment $28,671 $72,000
MA0859 #05 Y:2023 Recover waste heat from equipment $11,753 $40,550
MA0859 #04 Y:2023 Use adjustable frequency drive or multiple speed motors on existing system $13,456 $15,900
MA0859 #03 Y:2023 Recover waste heat from equipment $20,649 $46,300
MA0859 #02 Y:2023 Use solar heat to make electricty $166,304 $1,812,686
MA0859 #01 Y:2023 Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $1,034,369 $4,078,943
MA0848 #05 Y:2022 Adjust vents to minimize energy use $5,306 $6,125
MA0848 #04 Y:2022 Use adjustable frequency drive or multiple speed motors on existing system $11,130 $26,000
MA0848 #03 Y:2022 Use adjustable frequency drive or multiple speed motors on existing system $14,335 $15,950
MA0848 #02 Y:2022 Use cooling tower or economizer to replace chiller cooling $26,885 $30,500
MA0848 #01 Y:2022 Use solar heat to make electricty $285,734 $2,502,664
MA0846 #06 Y:2022 Turn off equipment during breaks, reduce operating time $674 $3,293
MA0846 #05 Y:2022 Install occupancy sensors $1,483 $4,908
MA0846 #04 Y:2022 Reduce the pressure of compressed air to the minimum required $6,290 $625
MA0846 #03 Y:2022 Use adjustable frequency drive or multiple speed motors on existing system $33,534 $15,450
MA0846 #02 Y:2022 Insulate bare equipment $10,916 $5,542
MA0846 #01 Y:2022 Use solar heat to make electricty $128,459 $1,302,718
MA0839 #04 Y:2022 Use adjustable frequency drive or multiple speed motors on existing system $366 $2,775
MA0839 #03 Y:2022 Utilize higher efficiency lamps and/or ballasts $4,751 $13,391
MA0839 #02 Y:2022 Insulate glazing, walls, ceilings, and roofs $2,763 $3,268