Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

904

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SU0596 #10 Y:2026 Minimize water usage $7,684 $58,011
SU0596 #09 Y:2026 Use solar heat to make electricty $279,051 $1,975,584
SU0596 #08 Y:2026 Use solar heat to make electricty $15,943 $90,999
SU0596 #07 Y:2026 Replace existing hvac unit with high efficiency model $20,297 $78,702
SU0596 #06 Y:2026 Install vinyl strip / high speed / air curtain doors $252 $614
SU0596 #05 Y:2026 Install vinyl strip / high speed / air curtain doors $1,475 $3,272
SU0596 #04 Y:2026 Install compressor air intakes in coolest locations $357 $702
SU0596 #03 Y:2026 Conserve energy by efficient use of vending machines $2,112 $1,874
SU0596 #02 Y:2026 Use or replace with energy efficient substitutes $2,453 $2,090
SU0596 #01 Y:2026 Eliminate/reduce an operation $3,728 $125
MA0859 #06 Y:2023 Recover waste heat from equipment $28,671 $72,000
MA0859 #05 Y:2023 Recover waste heat from equipment $11,753 $40,550
MA0859 #04 Y:2023 Use adjustable frequency drive or multiple speed motors on existing system $13,456 $15,900
MA0859 #03 Y:2023 Recover waste heat from equipment $20,649 $46,300
MA0859 #02 Y:2023 Use solar heat to make electricty $166,304 $1,812,686
MA0859 #01 Y:2023 Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $1,034,369 $4,078,943
MA0848 #05 Y:2022 Adjust vents to minimize energy use $5,306 $6,125
MA0848 #04 Y:2022 Use adjustable frequency drive or multiple speed motors on existing system $11,130 $26,000
MA0848 #03 Y:2022 Use adjustable frequency drive or multiple speed motors on existing system $14,335 $15,950
MA0848 #02 Y:2022 Use cooling tower or economizer to replace chiller cooling $26,885 $30,500