ITAC Assessment: MA0839
ITAC logo
ITAC Assessment: MA0839
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Specialty lubricants
NAICS 324191: Petroleum Lubricating Oil and Grease Manufacturing
SIC 2992: Lubricating Oils and Greases
Sales Range $1
M
to 5
M
# of Employees 28
Plant Area 54,000
ft2
Annual Production 1,800
ton
Production Hrs. Annual 4,290
hrs
Location (State) New Hampshire

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $95,393 971,800
kWh
Electricity Demand $51,294 2,842
kW-mo/yr
Electricity Fees $4,473 -
Natural Gas $12,697 1,342
MMBtu
Waste Disposal Costs
Water Usage $3,596 3,222
Tgal
TOTAL YEARLY COSTS $167,453
RECOMMENDED SAVINGS* $96,543 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,880

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.9114: Use solar heat to make electricty $88,663 $1,287,855 $88,663
904,725
kWh
- -
02 2.7491: Insulate glazing, walls, ceilings, and roofs $2,763 $3,268 - - $2,763
-
MMBtu
03 2.7142: Utilize higher efficiency lamps and/or ballasts $4,751 $13,391 $3,794
38,712
kWh
$957
-
kW-mo/yr
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $366 $2,775 $294
3,002
kWh
$72
-
kW-mo/yr
-
TOTAL RECOMMENDED $96,543 $1,307,289 $92,751
946,439
kWh
$1,029
-
kW-mo/yr
$2,763
-
MMBtu
TOTAL IMPLEMENTED $7,880 $19,434 $4,088
41,714
kWh
$1,029
-
kW-mo/yr
$2,763
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs