ITAC Assessment: UD0586
ITAC logo
ITAC Assessment: UD0586
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Food products
NAICS
n/a
SIC 2026: Fluid Milk
Sales Range $50
M
to 100
M
# of Employees 190
Plant Area 100,000
ft2
Annual Production 364,000,000
lb
Production Hrs. Annual 7,488
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $230,401 7,073,857
kWh
Electricity Demand $288,179 15,696
kW-mo/yr
Natural Gas $93,182 26,022
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $676,616 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $23,837

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings Water Consumption Savings Primary Product Savings Increase in Production Savings
01 4.131: Modify process to reduce material use/cost $454,896 $340,000 - - - $219,024 - - - $235,872 -
02 3.4131: Minimize contamination of water before treatment $99,635 $350,000 - - $(-9,967.0) $(-12,012.0) $148,134 $(-26,520.0) - - -
03 4.111: Add equipment/ operators to reduce production bottleneck $96,665 $5,000 - - - - - - - - $96,665
04 3.4151: Minimize water usage $18,654 $298 - - - - - - $18,654
-
Tgal
- -
05 2.4231: Reduce the pressure of compressed air to the minimum required $5,183 - $1,679
72,978
kWh
$3,504
-
kW-mo/yr
- - - - - - -
06 2.3131: Reschedule plant operations or reduce load to avoid peaks $1,583 - $383
18,171
kWh
$1,200
-
kW-mo/yr
- - - - - - -
TOTAL RECOMMENDED $676,616 $695,298 $2,062
91,149
kWh
$4,704
-
kW-mo/yr
$(-9,967.0) $207,012 $148,134 $(-26,520.0) $18,654
-
Tgal
$235,872 $96,665
TOTAL IMPLEMENTED $23,837 $298 $1,679
72,978
kWh
$3,504
-
kW-mo/yr
- - - - $18,654
-
Tgal
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings Water Consumption Savings Primary Product Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs