ITAC Assessment: MA0859
ITAC logo
ITAC Assessment: MA0859
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Hook and Loop Fasteners
NAICS 339993: Fastener, Button, Needle, and Pin Manufacturing
SIC 3965: Fasteners, Buttons, Needles, and Pins
Sales Range $50
M
to 100
M
# of Employees 205
Plant Area 420,000
ft2
Annual Production 15,000
thousand feet
Production Hrs. Annual 6,240
hrs
Location (State) New Hampshire

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,383,331 15,983,143
kWh
Electricity Demand $624,551 73,172
kW-mo/yr
Electricity Fees $41,051 -
Natural Gas $1,074,896 133,474
MMBtu
TOTAL YEARLY COSTS $3,123,829
RECOMMENDED SAVINGS* $1,275,202 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Administrative Changes Savings
01 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $1,034,369 $4,078,943 $2,068,727
15,183,986
kWh
- $(-206,873.0) $(-538,989.0)
-
MMBtu
$(-288,496.0)
02 2.9114: Use solar heat to make electricty $166,304 $1,812,686 $160,065
1,692,032
kWh
$6,239
-
kW-mo/yr
- - -
03 2.2437: Recover waste heat from equipment $20,649 $46,300 $9,509
100,513
kWh
$1,178
-
kW-mo/yr
- $9,962
-
MMBtu
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $13,456 $15,900 $11,980
126,642
kWh
$1,476
-
kW-mo/yr
- - -
05 2.2437: Recover waste heat from equipment $11,753 $40,550 - - - $12,443
-
MMBtu
$(-690.0)
06 2.2437: Recover waste heat from equipment $28,671 $72,000 - - - $28,671
-
MMBtu
-
TOTAL RECOMMENDED $1,275,202 $6,066,379 $2,250,281
17,103,173
kWh
$8,893
-
kW-mo/yr
$(-206,873.0) $(-487,913.0)
-
MMBtu
$(-289,186.0)
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs