ITAC Assessment: OK0025
ITAC logo
ITAC Assessment: OK0025
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1982
Principal Product PLASTIC PIPE
NAICS
n/a
SIC 3084: Plastics Pipe
Sales Range $10
M
to 50
M
# of Employees 400
Plant Area
n/a
Annual Production 80,000,000
lb
Production Hrs. Annual 8,736
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,241,577 21,470,106
kWh
Natural Gas $35,421 13,953
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $25,680 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $173 $293 $173
4,689
kWh
-
02 2.3212: Optimize plant power factor $14,183 $18,620 $14,183
-
kWh
-
03 2.4133: Use most efficient type of electric motors $3,084 $3,247 $3,084
123,388
kWh
-
04 2.4221: Install compressor air intakes in coolest locations $3,202 $290 $3,202
147,421
kWh
-
05 2.7261: Install timers and/or thermostats $223 $500 - $223
-
MMBtu
06 2.1311: Replace electrically-operated equipment with fossil fuel equipment $4,815 $90,000 $5,897
95,545
kWh
$(-1,082.0)
-
MMBtu
TOTAL RECOMMENDED $25,680 $112,950 $26,539
371,043
kWh
$(-859.0)
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs