| Assessment Year | 2025 |
|---|---|
| Principal Product | Lumber |
| NAICS | 321113: Sawmills |
| SIC | 2421: Sawmills and Planing Mills, General |
| Sales Range | $100 M to 500M |
| # of Employees | 169 |
| Plant Area |
117,000
ft2
|
| Annual Production | 200,000
thousand feet
|
| Production Hrs. Annual | 4,284
hrs
|
| Location (State) | Oregon |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $947,715 | 13,878,690 |
kWh
|
$0.068 |
| Electricity Demand | $410,431 | 33,938 |
kW-mo/yr
|
$12.09 |
| Electricity Fees | $115,766 | - |
|
- |
| Natural Gas | $18,412 | 6,777 |
MMBtu
|
$2.72 |
| TOTAL YEARLY COSTS | $1,492,324 | |||
| RECOMMENDED SAVINGS* | $77,384 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $12,434 | - |
$10,007
146,537
kWh
|
$2,427
-
kW-mo/yr
|
- | - | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $33,221 | $1,661 |
$26,737
391,517
kWh
|
$6,484
-
kW-mo/yr
|
- | - | |
| 03 | 2.7232: Replace existing hvac unit with high efficiency model | $8,154 | $4,022 |
$6,648
97,353
kWh
|
$1,506
-
kW-mo/yr
|
- | - | |
| 04 | 2.3212: Optimize plant power factor | $18,312 | $120,179 | - | - | $18,312 | - | |
| 05 | 2.2113: Repair or replace steam traps | $5,263 | $45,752 | - | - | - |
$5,263
-
MMBtu
|
|
| TOTAL RECOMMENDED | $77,384 | $171,614 |
$43,392
635,407
kWh
|
$10,417
-
kW-mo/yr
|
$18,312 |
$5,263
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs