ITAC Assessment: OR0816
ITAC logo
ITAC Assessment: OR0816
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Lumber
NAICS 321113: Sawmills
SIC 2421: Sawmills and Planing Mills, General
Sales Range $100
M
to 500
M
# of Employees 169
Plant Area 117,000
ft2
Annual Production 200,000
thousand feet
Production Hrs. Annual 4,284
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $947,715 13,878,690
kWh
Electricity Demand $410,431 33,938
kW-mo/yr
Electricity Fees $115,766 -
Natural Gas $18,412 6,777
MMBtu
TOTAL YEARLY COSTS $1,492,324
RECOMMENDED SAVINGS* $77,384 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $12,434 - $10,007
146,537
kWh
$2,427
-
kW-mo/yr
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $33,221 $1,661 $26,737
391,517
kWh
$6,484
-
kW-mo/yr
- -
03 2.7232: Replace existing hvac unit with high efficiency model $8,154 $4,022 $6,648
97,353
kWh
$1,506
-
kW-mo/yr
- -
04 2.3212: Optimize plant power factor $18,312 $120,179 - - $18,312 -
05 2.2113: Repair or replace steam traps $5,263 $45,752 - - - $5,263
-
MMBtu
TOTAL RECOMMENDED $77,384 $171,614 $43,392
635,407
kWh
$10,417
-
kW-mo/yr
$18,312 $5,263
-
MMBtu
TOTAL IMPLEMENTED - - - - - -