ITAC Assessment: UL0198
ITAC logo
ITAC Assessment: UL0198
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Magazine Printing
NAICS
n/a
SIC 2752: Commercial Printing, Lithographic
Sales Range $50
M
to 100
M
# of Employees 1,100
Plant Area 250,000
ft2
Annual Production 9,000
pieces
Production Hrs. Annual 7,488
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Demand $976,408 68,855
kW-mo/yr
Natural Gas $160,058 33,025
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $217,340 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings Primary Raw Material Savings One-time Revenue or Avoided Cost Savings
01 2.3212: Optimize plant power factor $45,615 $47,600 - $45,615
-
kW-mo/yr
- - - -
02 2.4231: Reduce the pressure of compressed air to the minimum required $5,727 $40 $3,552
131,594
kWh
$2,175
-
kW-mo/yr
- - - -
03 3.7134: Wash and reuse rags on-site $99,250 $150,000 - - - - $(-5,000.0) $104,250
04 3.5212: Regrind, reuse, or sell scrap plastic parts $6,748 - - - $6,748
-
lb
- - -
05 4.513: Re-arrange equipment layout to reduce labor costs $60,000 $2,000 - - - $60,000 - -
TOTAL RECOMMENDED $217,340 $199,640 $3,552
131,594
kWh
$47,790
-
kW-mo/yr
$6,748
-
lb
$60,000 $(-5,000.0) $104,250
TOTAL IMPLEMENTED - - - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs