Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

8,811

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MZ0371 #05 Y:2025 Replace boiler $383,764 $475,000
MZ0371 #04 Y:2025 Use waste heat from hot flue gases to preheat incoming fluids $1,555 $5,880
MZ0371 #03 Y:2025 Use flue gases to heat process or service water $1,063 $3,900
MZ0371 #02 Y:2025 Meter recycled water (to reduce sewer charges) $4,583 $70,000
MZ0371 #01 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $5,847 $3,600
IC0324 #07 Y:2024 Use or replace with energy efficient substitutes $4,575 $44,208
IC0324 #06 Y:2024 Clean or color roof to reduce solar load $19,325 $143,593
IC0324 #05 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $1,110 $1,610
IC0324 #04 Y:2024 Utilize controls to operate equipment only when needed $3,112 $1,626
IC0324 #03 Y:2024 Insulate bare equipment $898 $3,747
IC0324 #02 Y:2024 Turn off equipment during breaks, reduce operating time $1,773 $11,878
IC0324 #01 Y:2024 Use solar heat to make electricty $65,101 $294,166
IC0323 #07 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $130 $288
IC0323 #06 Y:2024 Replace boiler $5,000 $39,055
IC0323 #05 Y:2024 Utilize higher efficiency lamps and/or ballasts $497 $1,045
IC0323 #04 Y:2024 Install occupancy sensors $6,567 $6,783
IC0323 #03 Y:2024 Insulate bare equipment $984 $6,680
IC0323 #02 Y:2024 Use demand controller or load shedder $549 $2,512
IC0323 #01 Y:2024 Use solar heat to make electricty $47,182 $233,599
IC0322 #11 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $205 $144