8,960
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| MZ0390 #08 Y:2025 | 08 | 2025 | Use or replace with energy efficient substitutes | $2,878 | $1,700 |
n/a
|
| MZ0390 #07 Y:2025 | 07 | 2025 | Install occupancy sensors | $196 | $725 |
n/a
|
| MZ0390 #06 Y:2025 | 06 | 2025 | Reduce the pressure of compressed air to the minimum required | $3,595 | $1,000 |
n/a
|
| MZ0390 #05 Y:2025 | 05 | 2025 | Use waste heat from hot flue gases to preheat incoming fluids | $11,755 | $46,600 |
n/a
|
| MZ0390 #04 Y:2025 | 04 | 2025 | Analyze flue gas for proper air/fuel ratio | $7,996 | $1,600 |
n/a
|
| MZ0390 #03 Y:2025 | 03 | 2025 | Chill water to the highest temperature possible | $9,218 | $13,460 |
n/a
|
| MZ0390 #02 Y:2025 | 02 | 2025 | Chill water to the highest temperature possible | $8,616 | $19,492 |
n/a
|
| MZ0390 #01 Y:2025 | 01 | 2025 | Use adjustable frequency drive or multiple speed motors on existing system | $23,516 | $17,100 |
n/a
|
| IC0339 #07 Y:2025 | 07 | 2025 | Utilize higher efficiency lamps and/or ballasts | $822 | $400 |
n/a
|
| IC0339 #06 Y:2025 | 06 | 2025 | Eliminate leaks in inert gas and compressed air lines/ valves | $525 | $288 |
n/a
|
| IC0339 #05 Y:2025 | 05 | 2025 | Use or replace with energy efficient substitutes | $3,074 | $950 |
n/a
|
| IC0339 #04 Y:2025 | 04 | 2025 | Use or replace with energy efficient substitutes | $2,474 | $2,300 |
n/a
|
| IC0339 #03 Y:2025 | 03 | 2025 | Adopt in-house material generation | $7,821 | $66,659 |
n/a
|
| IC0339 #02 Y:2025 | 02 | 2025 | Use solar heat to make electricty | $134,142 | $691,579 |
n/a
|
| IC0339 #01 Y:2025 | 01 | 2025 | Install compressor air intakes in coolest locations | $1,251 | $780 |
n/a
|
| IC0338 #09 Y:2025 | 09 | 2025 | Use waste heat from hot flue gases to preheat incoming fluids | $5,570 | $19,032 |
n/a
|
| IC0338 #08 Y:2025 | 08 | 2025 | Eliminate or reduce compressed air usage | $833 | $576 |
n/a
|
| IC0338 #07 Y:2025 | 07 | 2025 | Insulate bare equipment | $34,779 | $59,600 |
n/a
|
| IC0338 #06 Y:2025 | 06 | 2025 | Use adjustable frequency drive or multiple speed motors on existing system | $2,751 | $2,378 |
n/a
|
| IC0338 #05 Y:2025 | 05 | 2025 | Utilize higher efficiency lamps and/or ballasts | $2,505 | $3,178 |
n/a
|