ITAC Assessment: IC0328
ITAC logo
ITAC Assessment: IC0328
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Wastewater Treatment
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range less than $500
k
# of Employees 10
Plant Area 430,000
ft2
Annual Production 6,200
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $199,255 2,849,655
kWh
Electricity Demand $63,121 5,901
kW-mo/yr
Electricity Fees $14,510 -
Natural Gas $11,418 2,000
MMBtu
TOTAL YEARLY COSTS $288,304
RECOMMENDED SAVINGS* $190,475 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4322: Use or replace with energy efficient substitutes $101,072 $435,474 $97,793
1,397,045
kWh
$3,278
-
kW-mo/yr
-
02 2.4322: Use or replace with energy efficient substitutes $82,241 $385,393 $80,831
1,154,727
kWh
$1,410
-
kW-mo/yr
-
03 2.6242: Minimize operation of equipment maintained in standby condition $239 - $235
3,360
kWh
$4
-
kW-mo/yr
-
04 2.7135: Install occupancy sensors $244 $694 $254
3,633
kWh
$2
-
kW-mo/yr
$(-12.0)
-
MMBtu
05 2.3322: Use existing dam to generate electricity $6,679 $33,300 $5,519
78,840
kWh
$1,160
-
kW-mo/yr
-
TOTAL RECOMMENDED $190,475 $854,861 $184,632
2,637,605
kWh
$5,854
-
kW-mo/yr
$(-12.0)
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs