ITAC Assessment: SF0073
ITAC logo
ITAC Assessment: SF0073
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Large Semiconductor Manufacturing Equipment
NAICS
n/a
SIC 3559: Special Industry Machinery, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 110
Plant Area 70,198
ft2
Annual Production 12
pieces
Production Hrs. Annual 5,200
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $209,573 2,762,310
kWh
Natural Gas $9,814 1,570
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $66,957 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $26,294

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Other Liquid (non-haz) Savings Administrative Changes Savings
01 2.4133: Use most efficient type of electric motors $760 $2,712 $760
8,792
kWh
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $19,344 $77,930 $19,344
249,707
kWh
- -
03 2.7135: Install occupancy sensors $216 $360 $216
2,931
kWh
- -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,574 $6,500 $3,574
59,203
kWh
- -
05 2.6218: Turn off equipment when not in use $2,035 $3,560 $2,035
33,118
kWh
- -
06 2.6212: Turn off equipment during breaks, reduce operating time $8,080 $2,950 $8,080
133,646
kWh
- -
07 2.7144: Install spectral reflectors / delamp $2,735 $1,768 $2,735
35,756
kWh
- -
08 2.3212: Optimize plant power factor $2,095 $2,297 $2,095
-
kWh
- -
09 3.6192: Use a less expensive method of waste removal $2,400 - - - $2,400
10 3.1191: Change procedures / equipment / operating conditions $25,718 $644 - $25,718
-
gal
-
TOTAL RECOMMENDED $66,957 $98,721 $38,839
523,153
kWh
$25,718
-
gal
$2,400
TOTAL IMPLEMENTED $26,294 $87,502 $23,894
320,633
kWh
- $2,400
Yearly Savings* Imp'd Cost* Electricity Usage Savings Other Liquid (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs