Assessment Year | 1995 |
---|---|
Principal Product | Large Semiconductor Manufacturing Equipment |
NAICS |
n/a
|
SIC | 3559: Special Industry Machinery, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 110 |
Plant Area |
70,198
ft2
|
Annual Production | 12
pieces
|
Production Hrs. Annual | 5,200
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $209,573 | 2,762,310 |
kWh
|
$0.076 |
Natural Gas | $9,814 | 1,570 |
MMBtu
|
$6.25 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $66,957 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $26,294 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Other Liquid (non-haz) Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $760 | $2,712 |
$760
8,792
kWh
|
- | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $19,344 | $77,930 |
$19,344
249,707
kWh
|
- | - | |
03 | 2.7135: Install occupancy sensors | $216 | $360 |
$216
2,931
kWh
|
- | - | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $3,574 | $6,500 |
$3,574
59,203
kWh
|
- | - | |
05 | 2.6218: Turn off equipment when not in use | $2,035 | $3,560 |
$2,035
33,118
kWh
|
- | - | |
06 | 2.6212: Turn off equipment during breaks, reduce operating time | $8,080 | $2,950 |
$8,080
133,646
kWh
|
- | - | |
07 | 2.7144: Install spectral reflectors / delamp | $2,735 | $1,768 |
$2,735
35,756
kWh
|
- | - | |
08 | 2.3212: Optimize plant power factor | $2,095 | $2,297 |
$2,095
-
kWh
|
- | - | |
09 | 3.6192: Use a less expensive method of waste removal | $2,400 | - | - | - | $2,400 | |
10 | 3.1191: Change procedures / equipment / operating conditions | $25,718 | $644 | - |
$25,718
-
gal
|
- | |
TOTAL RECOMMENDED | $66,957 | $98,721 |
$38,839
523,153
kWh
|
$25,718
-
gal
|
$2,400 | ||
TOTAL IMPLEMENTED | $26,294 | $87,502 |
$23,894
320,633
kWh
|
- | $2,400 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Other Liquid (non-haz) Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs