ITAC Assessment: CO0614
ITAC logo
ITAC Assessment: CO0614
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Analytical instruments
NAICS 334516: Analytical Laboratory Instrument Manufacturing
SIC 3826: Laboratory Analytical Instruments
Sales Range less than $500
k
# of Employees 950
Plant Area 216,315
ft2
Annual Production 300,000
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $237,822 7,744,800
kWh
Electricity Demand $132,522 15,596
kW-mo/yr
Electricity Fees $2,197 -
Natural Gas $104,097 12,909
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $18,170 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,260

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,580 $1,500 $1,900
60,500
kWh
$680
-
kW-mo/yr
- -
02 2.6218: Turn off equipment when not in use $1,670 $1,000 $1,670
53,000
kWh
- - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $10,010 $12,000 $7,550
239,800
kWh
$2,840
-
kW-mo/yr
- $(-380.0)
04 2.9112: Use solar heat to heat water $3,910 $84,000 - - $3,910
-
MMBtu
-
TOTAL RECOMMENDED $18,170 $98,500 $11,120
353,300
kWh
$3,520
-
kW-mo/yr
$3,910
-
MMBtu
$(-380.0)
TOTAL IMPLEMENTED $14,260 $14,500 $11,120
353,300
kWh
$3,520
-
kW-mo/yr
- $(-380.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs