| Assessment Year | 2025 |
|---|---|
| Principal Product | Gear and Gear Box |
| NAICS | 333612: Speed Changer, Industrial High-Speed Drive, and Gear Manufacturing |
| SIC | 3566: Speed Changers, Industrial High-Speed Drives, and Gears |
| Sales Range | $10 M to 50M |
| # of Employees | 50 |
| Plant Area |
36,000
ft2
|
| Annual Production | 25,000
units
|
| Production Hrs. Annual | 2,600
hrs
|
| Location (State) | Illinois |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $44,256 | 409,015 |
kWh
|
$0.11 | |
| Electricity Demand | $18,448 | 1,487 |
kW-mo/yr
|
$12.41 | |
| Electricity Fees | $16,250 | - |
|
- | |
| Natural Gas | $13,605 | 1,844 |
MMBtu
|
$7.38 | |
| Waste Disposal Costs | |||||
| Water Usage | $919 | 51 |
Tgal
|
$17.93 | |
| Other Liquid (non-haz) | $19,208 | 6,403 |
gal
|
$3.00 | |
| TOTAL YEARLY COSTS | $112,686 | ||||
| RECOMMENDED SAVINGS* | $4,979 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4221: Install compressor air intakes in coolest locations | $388 | $1,173 |
$254
2,351
kWh
|
$135
-
kW-mo/yr
|
|
| 02 | 2.4239: Eliminate or reduce compressed air usage | $963 | $720 |
$640
5,928
kWh
|
$322
-
kW-mo/yr
|
|
| 03 | 2.4322: Use or replace with energy efficient substitutes | $511 | $800 |
$389
3,604
kWh
|
$122
-
kW-mo/yr
|
|
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,312 | - |
$873
8,084
kWh
|
$439
-
kW-mo/yr
|
|
| 05 | 2.4322: Use or replace with energy efficient substitutes | $1,588 | $1,315 |
$509
4,713
kWh
|
$1,079
-
kW-mo/yr
|
|
| 06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $217 | - |
$144
1,337
kWh
|
$73
-
kW-mo/yr
|
|
| TOTAL RECOMMENDED | $4,979 | $4,008 |
$2,810
26,016
kWh
|
$2,169
-
kW-mo/yr
|
||
| TOTAL IMPLEMENTED | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs