Assessment Year | 2015 |
---|---|
Principal Product | Non-woven fabrics paper |
NAICS | 313230: Nonwoven Fabric Mills |
SIC | 2297: Non-woven Fabrics |
Sales Range | $10 M to 50M |
# of Employees | 108 |
Plant Area |
162,000
ft2
|
Annual Production | 7,500,000
lb
|
Production Hrs. Annual | 8,232
hrs
|
Location (State) | New Hampshire |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $641,393 | 8,393,712 |
kWh
|
$0.076 |
Electricity Demand | $244,714 | 15,442 |
kW-mo/yr
|
$15.85 |
Electricity Fees | $45,407 | - |
|
- |
Natural Gas | $648,815 | 63,705 |
MMBtu
|
$10.18 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $151,639 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $82,545 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $55,652 | $120,000 |
$58,606
767,095
kWh
|
$27,199
-
kW-mo/yr
|
$(-30,153.0)
-
MMBtu
|
|
02 | 2.3212: Optimize plant power factor | $38,357 | $25,972 | - |
$38,357
-
kW-mo/yr
|
- | |
03 | 2.2136: Install / repair insulation on steam lines | $24,583 | $5,560 | - | - |
$24,583
-
MMBtu
|
|
04 | 2.1113: Reduce combustion air flow to optimum | $9,330 | $1,000 | - | - |
$9,330
-
MMBtu
|
|
05 | 2.2437: Recover waste heat from equipment | $8,116 | $9,000 | - | - |
$8,116
-
MMBtu
|
|
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $7,465 | $11,685 |
$7,465
97,709
kWh
|
- | - | |
07 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $4,112 | $4,285 |
$4,112
53,823
kWh
|
- | - | |
08 | 2.1243: Use heat from boiler blowdown to preheat boiler feed water | $4,024 | $11,650 | - | - |
$4,024
-
MMBtu
|
|
TOTAL RECOMMENDED | $151,639 | $189,152 |
$70,183
918,627
kWh
|
$65,556
-
kW-mo/yr
|
$15,900
-
MMBtu
|
||
TOTAL IMPLEMENTED | $82,545 | $63,867 |
$7,465
97,709
kWh
|
$38,357
-
kW-mo/yr
|
$36,723
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs