ITAC Assessment: MA0742
ITAC logo
ITAC Assessment: MA0742
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Non-woven fabrics paper
NAICS 313230: Nonwoven Fabric Mills
SIC 2297: Non-woven Fabrics
Sales Range $10
M
to 50
M
# of Employees 108
Plant Area 162,000
ft2
Annual Production 7,500,000
lb
Production Hrs. Annual 8,232
hrs
Location (State) New Hampshire

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $641,393 8,393,712
kWh
Electricity Demand $244,714 15,442
kW-mo/yr
Electricity Fees $45,407 -
Natural Gas $648,815 63,705
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $151,639 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $82,545

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $55,652 $120,000 $58,606
767,095
kWh
$27,199
-
kW-mo/yr
$(-30,153.0)
-
MMBtu
02 2.3212: Optimize plant power factor $38,357 $25,972 - $38,357
-
kW-mo/yr
-
03 2.2136: Install / repair insulation on steam lines $24,583 $5,560 - - $24,583
-
MMBtu
04 2.1113: Reduce combustion air flow to optimum $9,330 $1,000 - - $9,330
-
MMBtu
05 2.2437: Recover waste heat from equipment $8,116 $9,000 - - $8,116
-
MMBtu
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $7,465 $11,685 $7,465
97,709
kWh
- -
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,112 $4,285 $4,112
53,823
kWh
- -
08 2.1243: Use heat from boiler blowdown to preheat boiler feed water $4,024 $11,650 - - $4,024
-
MMBtu
TOTAL RECOMMENDED $151,639 $189,152 $70,183
918,627
kWh
$65,556
-
kW-mo/yr
$15,900
-
MMBtu
TOTAL IMPLEMENTED $82,545 $63,867 $7,465
97,709
kWh
$38,357
-
kW-mo/yr
$36,723
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs