Assessment Year | 1997 |
---|---|
Principal Product | Flexible packaging. |
NAICS |
n/a
|
SIC | 2671: Packaging Paper and Plastics Film, Coated and Laminated |
Sales Range | $1 M to 5M |
# of Employees | 36 |
Plant Area |
16,400
ft2
|
Annual Production | 2,340,000
lb
|
Production Hrs. Annual | 4,267
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $25,839 | 583,236 |
kWh
|
$0.044 |
Electricity Demand | $11,681 | 2,706 |
kW-mo/yr
|
$4.32 |
Electricity Fees | $857 | - |
|
- |
Natural Gas | $8,236 | 1,979 |
MMBtu
|
$4.16 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $7,110 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Other Liquid (non-haz) Savings | Solid Waste (non-haz) Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7261: Install timers and/or thermostats | $1,652 | $150 | n/a |
$1,652
35,756
kWh
|
- | - | - |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,179 | $425 | n/a |
$917
19,930
kWh
|
$262
-
kW-mo/yr
|
- | - |
03 | 2.2611: Moderate cooling tower outlet temperature | $660 | $60 | n/a |
$660
14,361
kWh
|
- | - | - |
04 | 2.4221: Install compressor air intakes in coolest locations | $141 | $300 | n/a |
$141
2,931
kWh
|
- | - | - |
05 | 3.6112: Use filter and drying oven to reduce sludge volume | $2,250 | $500 | n/a | - | - |
$2,250
-
gal
|
- |
06 | 3.5313: Increase amount of waste recovered for resale | $1,228 | - | n/a | - | - | - |
$1,228
-
lb
|
TOTAL RECOMMENDED | $7,110 | $1,435 |
$3,370
72,978
kWh
|
$262
-
kW-mo/yr
|
$2,250
-
gal
|
$1,228
-
lb
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Other Liquid (non-haz) Savings | Solid Waste (non-haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs