ITAC Assessment: MZ0382
ITAC logo
ITAC Assessment: MZ0382
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product pre-pined metal coils
NAICS 332812: Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers
SIC 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 54
Plant Area 94,900
ft2
Annual Production 111,000
ton
Production Hrs. Annual 6,000
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $62,426 4,559,157
kWh
Electricity Demand $61,776 17,140
kW-mo/yr
Natural Gas $198,965 83,964
MMBtu
TOTAL YEARLY COSTS $323,167
RECOMMENDED SAVINGS* $151,308 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7224: Reduce space conditioning during non-working hours $595 $100 $183
13,057
kWh
- $412
-
MMBtu
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,303 $4,500 $1,303
93,063
kWh
- -
03 2.7135: Install occupancy sensors $179 $1,000 $179
12,780
kWh
- -
04 2.2314: Replace heat treating oven with more efficient unit $149,231 $825,000 $(-13,247.0)
(-966,960)
kWh
$(-6,939.0)
-
kW-mo/yr
$169,417
-
MMBtu
TOTAL RECOMMENDED $151,308 $830,600 $(-11,582.0)
(-848,060)
kWh
$(-6,939.0)
-
kW-mo/yr
$169,829
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs