ITAC Assessment: AR0193
ITAC logo
ITAC Assessment: AR0193
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Material Handleing Equipment
NAICS
n/a
SIC 3429: Hardware, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 300
Plant Area 150,000
ft2
Annual Production 5,500,000
pieces
Production Hrs. Annual 7,488
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $192,790 6,685,815
kWh
Electricity Demand $62,714 14,017
kW-mo/yr
Natural Gas $87,534 20,027
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $58,406 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $49,854

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Primary Product Savings
01 2.4239: Eliminate or reduce compressed air usage $8,366 $4,860 $7,154
204,865
kWh
$1,212
-
kW-mo/yr
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,115 $30 $1,789
50,410
kWh
$326
-
kW-mo/yr
- -
03 2.4234: Cool compressor air intake with heat exchanger $2,360 $3,000 $2,360
118,699
kWh
- - -
04 2.4133: Use most efficient type of electric motors $553 $653 $457
12,603
kWh
$96
-
kW-mo/yr
- -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $186 - $153
4,103
kWh
$33
-
kW-mo/yr
- -
06 3.5315: Lease / purchase baler; sell cardboard to recycler $21,302 $8,000 - - $21,302
-
Tgal
-
07 4.514: Re-arrange equipment layout to reduce handling costs $23,524 $1,000 - - - $23,524
TOTAL RECOMMENDED $58,406 $17,543 $11,913
390,680
kWh
$1,667
-
kW-mo/yr
$21,302
-
Tgal
$23,524
TOTAL IMPLEMENTED $49,854 $12,683 $4,606
181,712
kWh
$422
-
kW-mo/yr
$21,302
-
Tgal
$23,524
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs