Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,770

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
TT0358 #06 Y:2026 Keep doors and windows shut when not on use $523 -
TT0358 #05 Y:2026 Utilize energy-efficient belts and other improved mechanisms $779 $4,450
TT0358 #04 Y:2026 Recover heat from exhausted steam, hot air or hot water $3,054 $8,000
TT0358 #03 Y:2026 Install occupancy sensors $5,002 $3,750
TT0358 #02 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $13,898 $6,000
TT0358 #01 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $14,772 $1,500
LT8445 #06 Y:2026 Install occupancy sensors $5,585 $462
LT8445 #05 Y:2026 Use solar heat to make electricty $3,325 $45,179
LT8445 #04 Y:2026 Turn off equipment when not in use $1,834 $1,302
LT8445 #03 Y:2026 Modify facility to avoid excess maintenance costs $15,500 $3,029
LT8445 #02 Y:2026 Use photocell controls $15,602 $8,665
LT8445 #01 Y:2026 Utilize higher efficiency lamps and/or ballasts $18,570 $26,350
OK1165 #06 Y:2025 Replace fossil fuel equipment with electrical equipment $20,220 $86,500
OK1165 #05 Y:2025 Utilize higher efficiency lamps and/or ballasts $1,312 $7,084
OK1165 #04 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $25,293 $40,074
OK1165 #03 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $9,988 $13,005
OK1165 #02 Y:2025 Use computer programs to optimize hvac performance $2,462 $23,200
OK1165 #01 Y:2025 Clean and maintain refrigerant condensers and towers $294 $935
LT8432 #03 Y:2025 Turn off equipment when not in use $5,440 $1,807
LT8432 #02 Y:2025 Utilize energy-efficient belts and other improved mechanisms $7,598 $812