ITAC Assessment: LT8413
ITAC logo
ITAC Assessment: LT8413
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product automotive machine parts, toolboxes, carts/conveyors
NAICS 332999: All Other Miscellaneous Fabricated Metal Product Manufacturing
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 91
Plant Area 85,900
ft2
Annual Production 1,158
units
Production Hrs. Annual 7,592
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $167,220 2,235,643
kWh
Electricity Demand $73,032 8,290
kW-mo/yr
Waste Disposal Costs
Water Usage $3,513 370
Tgal
Water Disposal $3,513 370
Tgal
Solid Waste (non-haz) $16,015 209,940
lb
TOTAL YEARLY COSTS $263,293
RECOMMENDED SAVINGS* $54,466 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,456 $925 $3,456
51,075
kWh
- - -
02 2.6218: Turn off equipment when not in use $501 $1,131 $449
6,208
kWh
$75
-
kW-mo/yr
- $(-23.0)
03 3.6193: Install equipment (eg compactor) to reduce disposal costs $34,661 $16,400 $(-10.1)
(-80)
kWh
- $(-2,600.0) $37,271
04 2.7142: Utilize higher efficiency lamps and/or ballasts $15,848 $8,360 $(-7,694.1)
(-75,502)
kWh
$(-1,657.7)
-
kW-mo/yr
- $25,200
TOTAL RECOMMENDED $54,466 $26,816 $(-3,799.5)
(-18,299)
kWh
$(-1,582.8)
-
kW-mo/yr
$(-2,600.0) $62,448
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs