ITAC Assessment: OK0201
ITAC logo
ITAC Assessment: OK0201
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product STEEL FABRIC.FITTINGS
NAICS
n/a
SIC 3398: Metal Heat Treating
Sales Range $10
M
to 50
M
# of Employees 65
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 2,250
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $48,029 699,004
kWh
Natural Gas $20,949 4,769
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,015 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $999

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $361 $39 $361
6,155
kWh
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $564 - $644
10,844
kWh
- $(-80.0)
03 2.7231: Use radiant heater for spot heating $7,928 $18,000 - $7,928
-
MMBtu
-
04 2.4322: Use or replace with energy efficient substitutes $74 $50 $74
1,172
kWh
- -
05 2.2514: Cover open tanks $88 $133 - $88
-
MMBtu
-
TOTAL RECOMMENDED $9,015 $18,222 $1,079
18,171
kWh
$8,016
-
MMBtu
$(-80.0)
TOTAL IMPLEMENTED $999 $89 $1,079
18,171
kWh
- $(-80.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs