ITAC Assessment: RU0150
ITAC logo
ITAC Assessment: RU0150
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product PLASTIC,STEEL STRAPPING
NAICS
n/a
SIC 3499: Fabricated Metal Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 144
Plant Area
n/a
Annual Production 72,000,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) Maryland

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,352,420 21,774,033
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $277,555 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.4312: Improve lubrication practices $4,940 $2,000 $4,940
79,719
kWh
- -
02 2.3312: Install efficient rectifiers $100,936 $125,000 $100,936
1,627,491
kWh
- -
03 3.4115: Recover and reuse cooling water $14,788 $2,700 - - $14,788
04 2.8114: Change rate schedules or other changes in utility service $25,123 $44,000 - $25,123
-
MMBtu
-
05 2.4133: Use most efficient type of electric motors $517 $30 $517
8,206
kWh
- -
06 2.1233: Analyze flue gas for proper air/fuel ratio $2,376 $500 - $2,376
-
MMBtu
-
07 2.3212: Optimize plant power factor $5,770 - $5,770
93,200
kWh
- -
08 2.3412: Use waste heat to produce steam to drive a steam turbine-generator $123,105 $327,000 $270,816
4,368,113
kWh
$(-107,711.0)
-
MMBtu
$(-40,000.0)
TOTAL RECOMMENDED $277,555 $501,230 $382,979
6,176,729
kWh
$(-80,212.0)
-
MMBtu
$(-25,212.0)
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs