Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,419

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
GT0407 #05 Y:1990 Use computer programs to optimize hvac performance $940 -
GT0407 #04 Y:1990 Use heat from boiler blowdown to preheat boiler feed water $300 $3,000
GT0407 #03 Y:1990 Burn a less expensive grade of fuel $6,760 -
GT0407 #02 Y:1990 Use most efficient type of electric motors $198 $422
GT0407 #01 Y:1990 Utilize higher efficiency lamps and/or ballasts $1,233 $464
GT0406 #07 Y:1990 Utilize higher efficiency lamps and/or ballasts $6,678 $21,372
GT0406 #06 Y:1990 Use most efficient type of electric motors $1,125 $1,633
GT0406 #05 Y:1990 Improve lubrication practices $3,390 -
GT0406 #04 Y:1990 Install / repair insulation on steam lines $2,920 $815
GT0406 #03 Y:1990 Use optimum thickness insulation $5,930 $98
GT0406 #02 Y:1990 Analyze flue gas for proper air/fuel ratio $5,787 $14,000
GT0406 #01 Y:1990 Install compressor air intakes in coolest locations $772 $2,430
CO0185 #07 Y:1990 Optimize plant power factor $6,200 $7,400
CO0185 #06 Y:1990 Utilize energy-efficient belts and other improved mechanisms $790 $940
CO0185 #05 Y:1990 Install compressor air intakes in coolest locations $1,010 $300
CO0185 #04 Y:1990 Reduce the pressure of compressed air to the minimum required $1,620 $50
CO0185 #03 Y:1990 Minimize condenser cooling water temperature $2,390 $200
CO0185 #02 Y:1990 Reduce illumination to minimum necessary levels $4,370 $13,700
CO0185 #01 Y:1990 Install timers and/or thermostats $2,780 $750
CO0184 #07 Y:1990 Optimize plant power factor $18,190 $20,700