| Assessment Year | 1990 |
|---|---|
| Principal Product | AUTO BUMPERS & TRIM |
| NAICS |
n/a
|
| SIC | 3465: Automotive Stampings |
| Sales Range | $50 M to 100M |
| # of Employees | 500 |
| Plant Area |
n/a
|
| Annual Production | 8,600,000
pieces
|
| Production Hrs. Annual | 4,160
hrs
|
| Location (State) | Georgia |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $780,175 | 13,162,075 |
kWh
|
$0.059 |
| Natural Gas | $270,549 | 51,118 |
MMBtu
|
$5.29 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $26,602 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4221: Install compressor air intakes in coolest locations | $772 | $2,430 |
$772
12,896
kWh
|
- | |
| 02 | 2.1233: Analyze flue gas for proper air/fuel ratio | $5,787 | $14,000 | - |
$5,787
-
MMBtu
|
|
| 03 | 2.2515: Use optimum thickness insulation | $5,930 | $98 | - |
$5,930
-
MMBtu
|
|
| 04 | 2.2136: Install / repair insulation on steam lines | $2,920 | $815 | - |
$2,920
-
MMBtu
|
|
| 05 | 2.4312: Improve lubrication practices | $3,390 | - |
$3,390
57,151
kWh
|
- | |
| 06 | 2.4133: Use most efficient type of electric motors | $1,125 | $1,633 |
$1,125
19,050
kWh
|
- | |
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,678 | $21,372 |
$6,678
112,544
kWh
|
- | |
| TOTAL RECOMMENDED | $26,602 | $40,348 |
$11,965
201,641
kWh
|
$14,637
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs