ITAC Assessment: GT0406
ITAC logo
ITAC Assessment: GT0406
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product AUTO BUMPERS & TRIM
NAICS
n/a
SIC 3465: Automotive Stampings
Sales Range $50
M
to 100
M
# of Employees 500
Plant Area
n/a
Annual Production 8,600,000
pieces
Production Hrs. Annual 4,160
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $780,175 13,162,075
kWh
Natural Gas $270,549 51,118
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $26,602 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4221: Install compressor air intakes in coolest locations $772 $2,430 $772
12,896
kWh
-
02 2.1233: Analyze flue gas for proper air/fuel ratio $5,787 $14,000 - $5,787
-
MMBtu
03 2.2515: Use optimum thickness insulation $5,930 $98 - $5,930
-
MMBtu
04 2.2136: Install / repair insulation on steam lines $2,920 $815 - $2,920
-
MMBtu
05 2.4312: Improve lubrication practices $3,390 - $3,390
57,151
kWh
-
06 2.4133: Use most efficient type of electric motors $1,125 $1,633 $1,125
19,050
kWh
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $6,678 $21,372 $6,678
112,544
kWh
-
TOTAL RECOMMENDED $26,602 $40,348 $11,965
201,641
kWh
$14,637
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs