ITAC Assessment: UA0107
ITAC logo
ITAC Assessment: UA0107
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product steel
NAICS 331110: Iron and Steel Mills and Ferroalloy Manufacturing
SIC 3312: Steel Works, Blast Furnaces (Including Coke Ovens), and Rolling Mills
Sales Range $10
M
to 50
M
# of Employees 500
Plant Area 871,200
ft2
Annual Production 420,000
ton
Production Hrs. Annual 8,760
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $13,541,667 208,333,333
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $85,561 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $28,182 $17,526 $28,182
433,569
kWh
02 2.2691: Shut off cooling if cold outside air will cool process $38,831 $7,430 $38,831
597,394
kWh
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $18,548 $48 $18,548
285,352
kWh
TOTAL RECOMMENDED $85,561 $25,004 $85,561
1,316,315
kWh
TOTAL IMPLEMENTED - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs