ITAC Assessment: CO0184
ITAC logo
ITAC Assessment: CO0184
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product CIRCUIT COMPUTER CHIPS
NAICS
n/a
SIC 3674: Semiconductors and Related Devices
Sales Range $10
M
to 50
M
# of Employees 300
Plant Area
n/a
Annual Production 70
pieces
Production Hrs. Annual 8,736
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $638,224 16,844,080
kWh
Natural Gas $176,704 48,222
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $50,110 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $24,970

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2623: Minimize condenser cooling water temperature $7,600 $500 $7,600
201,348
kWh
-
02 2.1233: Analyze flue gas for proper air/fuel ratio $6,500 $4,000 - $6,500
-
MMBtu
03 2.7142: Utilize higher efficiency lamps and/or ballasts $3,630 $12,700 $3,630
95,838
kWh
-
04 2.7229: Air condition only space necessary $8,590 $1,300 $7,040
264,068
kWh
$1,550
-
MMBtu
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,320 $3,670 $3,320
87,046
kWh
-
06 2.4221: Install compressor air intakes in coolest locations $2,280 $2,100 $2,280
60,375
kWh
-
07 2.3212: Optimize plant power factor $18,190 $20,700 $18,190
-
kWh
-
TOTAL RECOMMENDED $50,110 $44,970 $42,060
708,675
kWh
$8,050
-
MMBtu
TOTAL IMPLEMENTED $24,970 $7,900 $16,920
525,791
kWh
$8,050
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs