ITAC Assessment: CO0185
ITAC logo
ITAC Assessment: CO0185
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product CIRCUIT COMPUTER CHIPS
NAICS
n/a
SIC 3674: Semiconductors and Related Devices
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area
n/a
Annual Production 98,000
pieces
Production Hrs. Annual 8,736
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $187,028 4,563,013
kWh
Natural Gas $28,441 7,511
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $19,160 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,800

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7261: Install timers and/or thermostats $2,780 $750 $1,950
73,857
kWh
$830
-
MMBtu
02 2.7111: Reduce illumination to minimum necessary levels $4,370 $13,700 $4,370
106,682
kWh
-
03 2.2623: Minimize condenser cooling water temperature $2,390 $200 $2,390
58,617
kWh
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $1,620 $50 $1,620
39,566
kWh
-
05 2.4221: Install compressor air intakes in coolest locations $1,010 $300 $1,010
24,619
kWh
-
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $790 $940 $790
19,050
kWh
-
07 2.3212: Optimize plant power factor $6,200 $7,400 $6,200
-
kWh
-
TOTAL RECOMMENDED $19,160 $23,340 $18,330
322,391
kWh
$830
-
MMBtu
TOTAL IMPLEMENTED $7,800 $1,300 $6,970
196,659
kWh
$830
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs