ITAC Assessment: AM0427
ITAC logo
ITAC Assessment: AM0427
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Electroplating
NAICS 332813: Electroplating, Plating, Polishing, Anodizing, and Coloring
SIC 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring
Sales Range $5
M
to 10
M
# of Employees 68
Plant Area 17,900
ft2
Annual Production 365,000
pieces
Production Hrs. Annual 4,630
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $64,536 918,774
kWh
Electricity Demand $8,822 3,507
kW-mo/yr
Electricity Fees $1,334 -
Natural Gas $543 8
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $15,220 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,220

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Personnel Changes Savings Primary Raw Material Savings
01 4.132: Purchase new equipment to reduce material use / cost $11,250 $500 - - $11,250
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,400 $820 $260
5,400
kWh
$2,140 -
03 2.4231: Reduce the pressure of compressed air to the minimum required $570 $60 $570
11,625
kWh
- -
04 2.7124: Make a practice of turning off lights when not needed $400 - $400
8,150
kWh
- -
05 2.4231: Reduce the pressure of compressed air to the minimum required $330 $60 $330
6,730
kWh
- -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $170 $50 $170
3,500
kWh
- -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $100 $50 $100
2,300
kWh
- -
TOTAL RECOMMENDED $15,220 $1,540 $1,830
37,705
kWh
$2,140 $11,250
TOTAL IMPLEMENTED $15,220 $1,540 $1,830
37,705
kWh
$2,140 $11,250
Yearly Savings* Imp'd Cost* Electricity Usage Savings Personnel Changes Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs