ITAC Assessment: TN0452
ITAC logo
ITAC Assessment: TN0452
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product LADIES OUTERWARE
NAICS
n/a
SIC 2337: Women's, Misses', and Juniors' Suits, Skirts, and Coats
Sales Range $5
M
to 10
M
# of Employees 270
Plant Area
n/a
Annual Production 450,000
pieces
Production Hrs. Annual 2,700
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $66,137 1,109,613
kWh
Natural Gas $42,137 8,380
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $15,814 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7123: Keep lamps and reflectors clean $7,540 $23,120 $6,999
116,647
kWh
- $541
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,135 $380 - $1,135
-
MMBtu
-
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,409 $4,375 $2,409
40,152
kWh
- -
04 2.7221: Lower temperature during the winter season and vice-versa $2,268 - $2,268
37,808
kWh
- -
05 2.2511: Insulate bare equipment $490 $182 - $490
-
MMBtu
-
06 2.6211: Conserve energy by efficient use of vending machines $884 $1,015 $884
14,068
kWh
- -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $1,088 $609 $1,683
28,136
kWh
- $(-595.0)
TOTAL RECOMMENDED $15,814 $29,681 $14,243
236,811
kWh
$1,625
-
MMBtu
$(-54.0)
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs