ITAC Assessment: TT0308
ITAC logo
ITAC Assessment: TT0308
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Tubs and Showers
NAICS 326191: Plastics Plumbing Fixture Manufacturing
SIC 3261: Vitreous China Plumbing Fixtures and China and Earthenware Fittings and Bathroom Accessories
Sales Range $5
M
to 10
M
# of Employees 35
Plant Area 55,000
ft2
Annual Production 450
units
Production Hrs. Annual 2,000
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $59,721 371,000
kWh
Natural Gas $32,511 3,191
MMBtu
Waste Disposal Costs
Water Usage $1,279 175
Tgal
Water Disposal $1,539 175
Tgal
TOTAL YEARLY COSTS $95,050
RECOMMENDED SAVINGS* $62,863 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,802

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings One-time Revenue or Avoided Cost Savings
01 2.9114: Use solar heat to make electricty $41,746 $279,600 $41,746
259,294
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $8,802 $5,726 $8,802
54,668
kWh
-
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,781 $4,500 $6,781
42,120
kWh
-
04 2.8121: Apply for tax-free status for energy purchases $3,092 - - $3,092
05 2.4231: Reduce the pressure of compressed air to the minimum required $1,800 $225 $1,800
11,180
kWh
-
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $642 $1,540 $642
3,982
kWh
-
TOTAL RECOMMENDED $62,863 $291,591 $59,771
371,244
kWh
$3,092
TOTAL IMPLEMENTED $8,802 $5,726 $8,802
54,668
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs