Assessment Year | 2024 |
---|---|
Principal Product | Tubs and Showers |
NAICS | 326191: Plastics Plumbing Fixture Manufacturing |
SIC | 3261: Vitreous China Plumbing Fixtures and China and Earthenware Fittings and Bathroom Accessories |
Sales Range | $5 M to 10M |
# of Employees | 35 |
Plant Area |
55,000
ft2
|
Annual Production | 450
units
|
Production Hrs. Annual | 2,000
hrs
|
Location (State) | Tennessee |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $59,721 | 371,000 |
kWh
|
$0.16 | |
Natural Gas | $32,511 | 3,191 |
MMBtu
|
$10.19 | |
Waste Disposal Costs | |||||
Water Usage | $1,279 | 175 |
Tgal
|
$7.33 | |
Water Disposal | $1,539 | 175 |
Tgal
|
$8.82 | |
TOTAL YEARLY COSTS | $95,050 | ||||
RECOMMENDED SAVINGS* | $62,863 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $8,802 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|
01 | 2.9114: Use solar heat to make electricty | $41,746 | $279,600 |
$41,746
259,294
kWh
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $8,802 | $5,726 |
$8,802
54,668
kWh
|
- | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $6,781 | $4,500 |
$6,781
42,120
kWh
|
- | |
04 | 2.8121: Apply for tax-free status for energy purchases | $3,092 | - | - | $3,092 | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,800 | $225 |
$1,800
11,180
kWh
|
- | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $642 | $1,540 |
$642
3,982
kWh
|
- | |
TOTAL RECOMMENDED | $62,863 | $291,591 |
$59,771
371,244
kWh
|
$3,092 | ||
TOTAL IMPLEMENTED | $8,802 | $5,726 |
$8,802
54,668
kWh
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs