2,223
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| WI0054 #01 Y:1989 | 01 | 1989 | Use or replace with energy efficient substitutes | $12,498 | $35,000 | |
| UD0289 #07 Y:1989 | 07 | 1989 | Recover and reuse cooling water | $5,791 | $20,000 | |
| UD0289 #06 Y:1989 | 06 | 1989 | Use proper thickness of insulation on building envelope | $9,331 | $25,000 | |
| UD0289 #05 Y:1989 | 05 | 1989 | Utilize higher efficiency lamps and/or ballasts | $356 | $75 | |
| UD0289 #04 Y:1989 | 04 | 1989 | Install compressor air intakes in coolest locations | $791 | $1,000 | |
| UD0289 #03 Y:1989 | 03 | 1989 | Eliminate leaks in inert gas and compressed air lines/ valves | $2,150 | $4,000 | |
| UD0289 #02 Y:1989 | 02 | 1989 | Reschedule plant operations or reduce load to avoid peaks | $2,453 | - | |
| UD0289 #01 Y:1989 | 01 | 1989 | Install timers and/or thermostats | $3,618 | $1,000 | |
| UD0288 #05 Y:1989 | 05 | 1989 | Lower light fixtures in high ceiling areas | $803 | - | |
| UD0288 #04 Y:1989 | 04 | 1989 | Re-use or recycle hot or cold process exhaust air | $31,629 | $90,000 | |
| UD0288 #03 Y:1989 | 03 | 1989 | Install / repair insulation on condensate lines | $23,159 | $10,000 | |
| UD0288 #02 Y:1989 | 02 | 1989 | Reduce ventilation air | $30,846 | $10,000 | |
| UD0288 #01 Y:1989 | 01 | 1989 | Use small number of high output units instead of many small inefficient units | $441,279 | $200,000 | |
| TN0370 #10 Y:1989 | 10 | 1989 | Replace electrically-operated equipment with fossil fuel equipment | $12,402 | $15,000 | |
| TN0370 #09 Y:1989 | 09 | 1989 | Reduce ventilation air | $118 | $173 | |
| TN0370 #08 Y:1989 | 08 | 1989 | Improve lubrication practices | $456 | - | |
| TN0370 #07 Y:1989 | 07 | 1989 | Insulate bare equipment | $2,374 | $624 | |
| TN0370 #06 Y:1989 | 06 | 1989 | Utilize higher efficiency lamps and/or ballasts | $943 | $243 | |
| TN0370 #05 Y:1989 | 05 | 1989 | Install set-back timers | $2,752 | - | |
| TN0370 #04 Y:1989 | 04 | 1989 | Eliminate leaks in inert gas and compressed air lines/ valves | $5,235 | $1,050 |