ITAC Assessment: UD0288
ITAC logo
ITAC Assessment: UD0288
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product WELDING CONSUMABLES
NAICS
n/a
SIC 3548: Electric and Gas Welding and Soldering Equipment
Sales Range $50
M
to 100
M
# of Employees 375
Plant Area
n/a
Annual Production 120,000,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $973,656 22,169,989
kWh
Natural Gas $546,095 130,023
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $527,716 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $54,808

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.5196: Use small number of high output units instead of many small inefficient units $441,279 $200,000 $21,375
456,038
kWh
$59,904
-
MMBtu
$360,000
02 2.7314: Reduce ventilation air $30,846 $10,000 $1,352
65,358
kWh
$29,494
-
MMBtu
-
03 2.2122: Install / repair insulation on condensate lines $23,159 $10,000 - $10,095
-
MMBtu
$13,064
04 2.2443: Re-use or recycle hot or cold process exhaust air $31,629 $90,000 - $31,629
-
MMBtu
-
05 2.7141: Lower light fixtures in high ceiling areas $803 - $728
17,585
kWh
- $75
TOTAL RECOMMENDED $527,716 $310,000 $23,455
538,981
kWh
$131,122
-
MMBtu
$373,139
TOTAL IMPLEMENTED $54,808 $20,000 $2,080
82,943
kWh
$39,589
-
MMBtu
$13,139
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs