ITAC Assessment: TN0370
ITAC logo
ITAC Assessment: TN0370
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product ELECTRIC CORDS & CABLES
NAICS
n/a
SIC 3357: Drawing and Insulating of Nonferrous Wire
Sales Range $10
M
to 50
M
# of Employees 270
Plant Area
n/a
Annual Production 18,000,000
pieces
Production Hrs. Annual 7,056
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $214,128 4,247,069
kWh
Fuel Oil #2 $2,683 560
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $49,658 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $32,012

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #2 Savings Administrative Changes Savings
01 2.7123: Keep lamps and reflectors clean $12,907 $20,156 $11,899
237,984
kWh
- $1,008
02 2.7261: Install timers and/or thermostats $6,433 $560 $6,433
128,664
kWh
- -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $6,038 - $6,038
120,750
kWh
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,235 $1,050 $5,235
104,631
kWh
- -
05 2.6232: Install set-back timers $2,752 - $2,752
55,100
kWh
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $943 $243 $943
18,757
kWh
- -
07 2.2511: Insulate bare equipment $2,374 $624 $2,374
47,479
kWh
- -
08 2.4312: Improve lubrication practices $456 - $456
9,086
kWh
- -
09 2.7314: Reduce ventilation air $118 $173 $118
2,345
kWh
- -
10 2.1311: Replace electrically-operated equipment with fossil fuel equipment $12,402 $15,000 $21,234
424,678
kWh
$(-8,832.0)
-
MMBtu
-
TOTAL RECOMMENDED $49,658 $37,806 $57,482
1,149,474
kWh
$(-8,832.0)
-
MMBtu
$1,008
TOTAL IMPLEMENTED $32,012 $22,009 $31,004
619,872
kWh
- $1,008
Yearly Savings* Imp'd Cost* Electricity Usage Savings Fuel Oil #2 Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs