Assessment Year | 1989 |
---|---|
Principal Product | METAL FABRICATION |
NAICS |
n/a
|
SIC | 3499: Fabricated Metal Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 450 |
Plant Area |
n/a
|
Annual Production | 0
units
|
Production Hrs. Annual | 7,200
hrs
|
Location (State) | Wisconsin |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $360,951 | 7,519,930 |
kWh
|
$0.048 |
Natural Gas | $327,246 | 72,204 |
MMBtu
|
$4.53 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $123,902 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $114,174 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.4322: Use or replace with energy efficient substitutes | $12,498 | $35,000 | - |
$12,498
-
MMBtu
|
- | |
02 | 2.8113: Purchase gas directly from a contract gas supplier | $91,315 | $20,000 | - |
$91,315
-
MMBtu
|
- | |
03 | 2.1233: Analyze flue gas for proper air/fuel ratio | $985 | $500 | - |
$1,035
-
MMBtu
|
$(-50.0) | |
04 | 2.7447: Install vinyl strip / high speed / air curtain doors | $1,279 | $6,300 | - |
$1,279
-
MMBtu
|
- | |
05 | 2.6212: Turn off equipment during breaks, reduce operating time | $3,752 | $4,500 |
$2,350
48,945
kWh
|
$1,402
-
MMBtu
|
- | |
06 | 2.4312: Improve lubrication practices | $9,728 | - |
$9,728
202,521
kWh
|
- | - | |
07 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $2,931 | - |
$2,931
60,961
kWh
|
- | - | |
08 | 2.4221: Install compressor air intakes in coolest locations | $1,414 | $4,000 |
$1,414
29,601
kWh
|
- | - | |
TOTAL RECOMMENDED | $123,902 | $70,300 |
$16,423
342,028
kWh
|
$107,529
-
MMBtu
|
$(-50.0) | ||
TOTAL IMPLEMENTED | $114,174 | $70,300 |
$6,695
139,507
kWh
|
$107,529
-
MMBtu
|
$(-50.0) | ||