Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,381

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
TN0259 #04 Y:1985 Reduce illumination to minimum necessary levels $2,582 -
TN0259 #03 Y:1985 Reduce the pressure of compressed air to the minimum required $3,946 $1,000
TN0259 #02 Y:1985 Enhance sensitivity of temperature control and cutoff $13,198 $565
TN0259 #01 Y:1985 Recover waste heat from equipment $31,022 $59,300
TN0249 #08 Y:1985 Reduce illumination to minimum necessary levels $393 $1,350
TN0249 #07 Y:1985 Install / repair insulation on condensate lines $138 $40
TN0249 #06 Y:1985 Insulate bare equipment $449 $172
TN0249 #05 Y:1985 Cover open tanks $843 $100
TN0249 #04 Y:1985 Insulate bare equipment $984 $277
TN0249 #03 Y:1985 Use minimum steam operating pressure $1,482 -
TN0249 #02 Y:1985 Analyze flue gas for proper air/fuel ratio $1,598 -
TN0249 #01 Y:1985 Install / repair insulation on steam lines $3,085 $583
TN0248 #07 Y:1985 Install compressor air intakes in coolest locations $457 $500
TN0248 #06 Y:1985 Reduce illumination to minimum necessary levels $967 -
TN0248 #05 Y:1985 Install vinyl strip / high speed / air curtain doors $354 $399
TN0248 #04 Y:1985 Insulate bare equipment $1,044 $750
TN0248 #03 Y:1985 Cover open tanks $1,628 $800
TN0248 #02 Y:1985 Improve air circulation with destratification fans / other methods $2,354 $4,000
TN0248 #01 Y:1985 Eliminate leaks in inert gas and compressed air lines/ valves $7,966 $375
TN0247 #03 Y:1985 Insulate bare equipment $808 $500