| Assessment Year | 1985 |
|---|---|
| Principal Product | WORSTEN KNITTING YARNS |
| NAICS |
n/a
|
| SIC | 2281: Yarn Spinning Mills |
| Sales Range | $50 M to 100M |
| # of Employees | 480 |
| Plant Area |
n/a
|
| Annual Production | 17,000,000
lb
|
| Production Hrs. Annual | 0
hrs
|
| Location (State) | Kentucky |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $559,623 | 16,658,558 |
kWh
|
$0.034 |
| Natural Gas | $141,143 | 23,776 |
MMBtu
|
$5.94 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $52,171 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $16,777 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.2437: Recover waste heat from equipment | $31,022 | $59,300 | - |
$31,022
-
MMBtu
|
|
| 02 | 2.2223: Enhance sensitivity of temperature control and cutoff | $13,198 | $565 | - |
$13,198
-
MMBtu
|
|
| 03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $3,946 | $1,000 |
$3,946
119,578
kWh
|
- | |
| 04 | 2.7111: Reduce illumination to minimum necessary levels | $2,582 | - |
$2,582
78,253
kWh
|
- | |
| 05 | 2.2122: Install / repair insulation on condensate lines | $997 | $108 | - |
$997
-
MMBtu
|
|
| 06 | 2.4221: Install compressor air intakes in coolest locations | $426 | $220 |
$426
12,896
kWh
|
- | |
| TOTAL RECOMMENDED | $52,171 | $61,193 |
$6,954
210,727
kWh
|
$45,217
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $16,777 | $673 |
$2,582
78,253
kWh
|
$14,195
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs