ITAC Assessment: NC0099
ITAC logo
ITAC Assessment: NC0099
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Automotive relays
NAICS
n/a
SIC 3625: Relays and Industrial Controls
Sales Range $50
M
to 100
M
# of Employees 330
Plant Area 88,900
ft2
Annual Production 11,200,000
pieces
Production Hrs. Annual 8,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $153,652 4,734,467
kWh
Electricity Demand $116,182 10,103
kW-mo/yr
Natural Gas $1,234 197
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $56,049 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (haz) Savings
01 2.3191: Use demand controller or load shedder $1,822 $7,500 n/a - $1,822
-
kW-mo/yr
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $13,237 $27,552 n/a $8,297
268,464
kWh
$4,940
-
kW-mo/yr
-
03 2.7124: Make a practice of turning off lights when not needed $201 $40 n/a $129
4,103
kWh
$72
-
kW-mo/yr
-
04 2.2694: Use highest temperature for chilling or cold storage $289 $10 n/a $185
5,862
kWh
$104
-
kW-mo/yr
-
05 2.4221: Install compressor air intakes in coolest locations $1,927 $200 n/a $1,237
40,152
kWh
$690
-
kW-mo/yr
-
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,592 $390 n/a $992
32,239
kWh
$600
-
kW-mo/yr
-
07 2.4239: Eliminate or reduce compressed air usage $5,397 $1,600 n/a $866
28,136
kWh
$4,531
-
kW-mo/yr
-
08 3.1191: Change procedures / equipment / operating conditions $31,584 $66,000 n/a - - $31,584
-
lb
TOTAL RECOMMENDED $56,049 $103,292 $11,706
378,956
kWh
$12,759
-
kW-mo/yr
$31,584
-
lb
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs