ITAC Assessment: NC0237
ITAC logo
ITAC Assessment: NC0237
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product air filters
NAICS
n/a
SIC 3564: Industrial and Commercial Fans and Blowers and Air Purification Equipment
Sales Range $10
M
to 50
M
# of Employees 300
Plant Area 120,000
ft2
Annual Production 90,000
pieces
Production Hrs. Annual 4,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $186,022 5,215,350
kWh
Electricity Demand $70,061 16,146
kW-mo/yr
Electricity Fees $7,692 -
Natural Gas $69,396 10,022
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $17,173 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,413

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings
01 3.5131: Recycle white water $6,970 $3,500 - - - $6,970
-
Tgal
02 2.7111: Reduce illumination to minimum necessary levels $1,443 $680 $344
9,656
kWh
$1,099
-
kW-mo/yr
- -
03 2.2437: Recover waste heat from equipment $2,935 $3,000 - - $2,935
-
MMBtu
-
04 2.3131: Reschedule plant operations or reduce load to avoid peaks $5,825 $500 - $5,825
-
kW-mo/yr
- -
TOTAL RECOMMENDED $17,173 $7,680 $344
9,656
kWh
$6,924
-
kW-mo/yr
$2,935
-
MMBtu
$6,970
-
Tgal
TOTAL IMPLEMENTED $8,413 $4,180 $344
9,656
kWh
$1,099
-
kW-mo/yr
- $6,970
-
Tgal
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs