ITAC Assessment: TN0247
ITAC logo
ITAC Assessment: TN0247
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product GAS RANGE BURNERS
NAICS
n/a
SIC 3469: Metal Stampings, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 220
Plant Area
n/a
Annual Production 6,000,000
pieces
Production Hrs. Annual 4,375
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $92,851 1,768,757
kWh
Natural Gas $22,305 3,683
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,669 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,669

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.5194: Redesign process $8,108 $2,000 $8,108
155,920
kWh
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,753 $135 $1,753
33,705
kWh
03 2.2511: Insulate bare equipment $808 $500 $808
15,533
kWh
TOTAL RECOMMENDED $10,669 $2,635 $10,669
205,158
kWh
TOTAL IMPLEMENTED $10,669 $2,635 $10,669
205,158
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs