ITAC Assessment: TN0248
ITAC logo
ITAC Assessment: TN0248
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product GRILLES & REGISTERS
NAICS
n/a
SIC 3444: Sheet Metal Work
Sales Range $10
M
to 50
M
# of Employees 90
Plant Area
n/a
Annual Production 1,407,994
pieces
Production Hrs. Annual 4,080
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $71,716 1,196,073
kWh
Natural Gas $47,898 8,185
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $14,770 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,416

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $7,966 $375 $7,966
132,767
kWh
-
02 2.7243: Improve air circulation with destratification fans / other methods $2,354 $4,000 - $2,354
-
MMBtu
03 2.2514: Cover open tanks $1,628 $800 - $1,628
-
MMBtu
04 2.2511: Insulate bare equipment $1,044 $750 - $1,044
-
MMBtu
05 2.7447: Install vinyl strip / high speed / air curtain doors $354 $399 - $354
-
MMBtu
06 2.7111: Reduce illumination to minimum necessary levels $967 - $967
16,120
kWh
-
07 2.4221: Install compressor air intakes in coolest locations $457 $500 $457
7,620
kWh
-
TOTAL RECOMMENDED $14,770 $6,824 $9,390
156,507
kWh
$5,380
-
MMBtu
TOTAL IMPLEMENTED $14,416 $6,425 $9,390
156,507
kWh
$5,026
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs