ITAC Assessment: UF0519
ITAC logo
ITAC Assessment: UF0519
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Commercial Printing, Lithographic
NAICS 323111: Commercial Printing (except Screen and Books)
SIC 2752: Commercial Printing, Lithographic
Sales Range $10
M
to 50
M
# of Employees 277
Plant Area 250,000
ft2
Annual Production 183,205,000
units
Production Hrs. Annual 8,736
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,061,709 18,660,660
kWh
Electricity Demand $422,211 34,523
kW-mo/yr
Electricity Fees $127,458 -
Natural Gas $169,522 44,884
MMBtu
TOTAL YEARLY COSTS $1,780,900
RECOMMENDED SAVINGS* $87,021 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $37,619

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings One-time Revenue or Avoided Cost Savings
01 2.7233: Use properly designed and sized hvac equipment $27,363 $868 $27,363
480,060
kWh
-
02 2.3212: Optimize plant power factor $17,618 $30,000 - $17,618
03 2.7226: Use computer programs to optimize hvac performance $11,657 $25,600 $11,657
204,506
kWh
-
04 2.7491: Insulate glazing, walls, ceilings, and roofs $8,569 $45,225 $8,569
150,342
kWh
-
05 2.2522: Isolate hot or cold equipment $6,694 $2,710 $6,694
117,440
kWh
-
06 2.4224: Upgrade controls on compressors $5,422 $25,600 $5,422
95,115
kWh
-
07 2.3131: Reschedule plant operations or reduce load to avoid peaks $4,271 $25,600 $4,271
74,922
kWh
-
08 2.4225: Install common header on compressors $2,514 $3,216 $2,514
44,100
kWh
-
09 2.7447: Install vinyl strip / high speed / air curtain doors $1,687 $1,850 $1,687
29,596
kWh
-
10 2.2611: Moderate cooling tower outlet temperature $1,226 $5,454 $1,226
21,520
kWh
-
TOTAL RECOMMENDED $87,021 $166,123 $69,403
1,217,601
kWh
$17,618
TOTAL IMPLEMENTED $37,619 $47,943 $37,619
659,998
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs