| Assessment Year | 2026 |
|---|---|
| Principal Product | Extruded Film |
| NAICS | 322220: Paper Bag and Coated and Treated Paper Manufacturing |
| SIC | 3842: Orthopedic, Prosthetic, and Surgical Appliances and Supplies |
| Sales Range | $10 M to 50M |
| # of Employees | 14 |
| Plant Area |
41,724
ft2
|
| Annual Production | 100,000
units
|
| Production Hrs. Annual | 6,240
hrs
|
| Location (State) | New Jersey |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $115,534 | 1,025,815 |
kWh
|
$0.11 |
| Electricity Demand | $22,529 | 2,856 |
kW-mo/yr
|
$7.89 |
| Electricity Fees | $52 | - |
|
- |
| Natural Gas | $15,541 | 674 |
MMBtu
|
$23.06 |
| TOTAL YEARLY COSTS | $153,656 | |||
| RECOMMENDED SAVINGS* | $246,159 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | LPG Savings | One-time Revenue or Avoided Cost Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,762 | - |
$2,517
22,277
kWh
|
$245
-
kW-mo/yr
|
- | - | - | |
| 02 | 2.7135: Install occupancy sensors | $2,212 | $350 |
$2,212
19,573
kWh
|
- | - | - | - | |
| 03 | 2.7261: Install timers and/or thermostats | $7,578 | $1,600 |
$3,725
32,960
kWh
|
- |
$3,853
-
MMBtu
|
- | - | |
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,274 | $1,640 |
$4,816
42,587
kWh
|
$458
-
kW-mo/yr
|
- | - | - | |
| 05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,648 | $1,825 |
$1,175
10,400
kWh
|
$473
-
kW-mo/yr
|
- | - | - | |
| 06 | 2.1321: Replace fossil fuel equipment with electrical equipment | $50,845 | $60,000 | - | - | - |
$50,845
-
MMBtu
|
- | |
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,702 | $4,527 |
$2,386
21,116
kWh
|
$316
-
kW-mo/yr
|
- | - | - | |
| 08 | 2.4221: Install compressor air intakes in coolest locations | $1,699 | $3,000 |
$1,548
13,696
kWh
|
$151
-
kW-mo/yr
|
- | - | - | |
| 09 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $157,500 | $340,000 | - | - | - | - | $157,500 | |
| 10 | 2.7232: Replace existing hvac unit with high efficiency model | $13,939 | $42,829 |
$12,311
108,946
kWh
|
$1,628
-
kW-mo/yr
|
- | - | - | |
| TOTAL RECOMMENDED | $246,159 | $455,771 |
$30,690
271,555
kWh
|
$3,271
-
kW-mo/yr
|
$3,853
-
MMBtu
|
$50,845
-
MMBtu
|
$157,500 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||