ITAC Assessment: KU0276
ITAC logo
ITAC Assessment: KU0276
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product DIE CAST PARTS
NAICS
n/a
SIC 3364: Nonferrous Die-Castings, Except Aluminum
Sales Range $5
M
to 10
M
# of Employees 100
Plant Area
n/a
Annual Production 258,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $204,660 3,642,439
kWh
LPG $93,111 32,765
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,184 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $901

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings LPG Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $757 $1,432 $757
13,482
kWh
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $658 $150 $658
11,723
kWh
-
03 2.4133: Use most efficient type of electric motors $243 $133 $243
4,396
kWh
-
04 2.2414: Use waste heat from hot flue gases to preheat $9,066 $22,000 - $9,066
-
MMBtu
05 2.1122: Re-size charging openings or add a movable door on equipment $460 $400 - $460
-
MMBtu
TOTAL RECOMMENDED $11,184 $24,115 $1,658
29,601
kWh
$9,526
-
MMBtu
TOTAL IMPLEMENTED $901 $283 $901
16,119
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs