ITAC Assessment: AS0526
ITAC logo
ITAC Assessment: AS0526
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product single malt whiskey
NAICS 311213: Malt Manufacturing
SIC 5813: Drinking Places (alcoholic Beverages)
Sales Range $1
M
to 5
M
# of Employees 15
Plant Area 7,959
ft2
Annual Production 3
Tgal
Production Hrs. Annual 3,500
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $5,484 180,603
kWh
Electricity Fees $33,404 -
Natural Gas $12,179 1,302
MMBtu
Waste Disposal Costs
Water Usage $3,137 754
Tgal
TOTAL YEARLY COSTS $54,204
RECOMMENDED SAVINGS* $10,437 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,839

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Natural Gas Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
01 2.8121: Apply for tax-free status for energy purchases $8,135 $500 - $1,627 - - $6,508
02 2.1233: Analyze flue gas for proper air/fuel ratio $1,336 $650 - - $1,336
-
MMBtu
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $598 $1,116 $458
15,274
kWh
- - $140 -
04 2.8114: Change rate schedules or other changes in utility service $368 $200 - $368 - - -
TOTAL RECOMMENDED $10,437 $2,466 $458
15,274
kWh
$1,995 $1,336
-
MMBtu
$140 $6,508
TOTAL IMPLEMENTED $9,839 $1,350 - $1,995 $1,336
-
MMBtu
- $6,508
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs