| Assessment Year | 1985 |
|---|---|
| Principal Product | PLASTIC-COATED METAL |
| NAICS |
n/a
|
| SIC | 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified |
| Sales Range | $1 M to 5M |
| # of Employees | 60 |
| Plant Area |
n/a
|
| Annual Production | 6,500,000
pieces
|
| Production Hrs. Annual | 6,240
hrs
|
| Location (State) | Tennessee |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $57,012 | 1,026,964 |
kWh
|
$0.056 |
| Natural Gas | $67,891 | 11,115 |
MMBtu
|
$6.11 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $8,972 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $7,736 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.2136: Install / repair insulation on steam lines | $3,085 | $583 | - |
$3,085
-
MMBtu
|
- | |
| 02 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,598 | - | - |
$2,098
-
MMBtu
|
$(-500.0) | |
| 03 | 2.2163: Use minimum steam operating pressure | $1,482 | - | - |
$1,482
-
MMBtu
|
- | |
| 04 | 2.2511: Insulate bare equipment | $984 | $277 | - |
$984
-
MMBtu
|
- | |
| 05 | 2.2514: Cover open tanks | $843 | $100 | - |
$843
-
MMBtu
|
- | |
| 06 | 2.2511: Insulate bare equipment | $449 | $172 | - |
$449
-
MMBtu
|
- | |
| 07 | 2.2122: Install / repair insulation on condensate lines | $138 | $40 | - |
$138
-
MMBtu
|
- | |
| 08 | 2.7111: Reduce illumination to minimum necessary levels | $393 | $1,350 |
$393
7,034
kWh
|
- | - | |
| TOTAL RECOMMENDED | $8,972 | $2,522 |
$393
7,034
kWh
|
$9,079
-
MMBtu
|
$(-500.0) | ||
| TOTAL IMPLEMENTED | $7,736 | $1,072 | - |
$8,236
-
MMBtu
|
$(-500.0) | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs