ITAC Assessment: TN0249
ITAC logo
ITAC Assessment: TN0249
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product PLASTIC-COATED METAL
NAICS
n/a
SIC 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 60
Plant Area
n/a
Annual Production 6,500,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $57,012 1,026,964
kWh
Natural Gas $67,891 11,115
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,972 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,736

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.2136: Install / repair insulation on steam lines $3,085 $583 - $3,085
-
MMBtu
-
02 2.1233: Analyze flue gas for proper air/fuel ratio $1,598 - - $2,098
-
MMBtu
$(-500.0)
03 2.2163: Use minimum steam operating pressure $1,482 - - $1,482
-
MMBtu
-
04 2.2511: Insulate bare equipment $984 $277 - $984
-
MMBtu
-
05 2.2514: Cover open tanks $843 $100 - $843
-
MMBtu
-
06 2.2511: Insulate bare equipment $449 $172 - $449
-
MMBtu
-
07 2.2122: Install / repair insulation on condensate lines $138 $40 - $138
-
MMBtu
-
08 2.7111: Reduce illumination to minimum necessary levels $393 $1,350 $393
7,034
kWh
- -
TOTAL RECOMMENDED $8,972 $2,522 $393
7,034
kWh
$9,079
-
MMBtu
$(-500.0)
TOTAL IMPLEMENTED $7,736 $1,072 - $8,236
-
MMBtu
$(-500.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs