Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,700

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
OK1064 #03 Y:2021 Repair faulty insulation in furnaces, boilers, etc $367 $700
OK1064 #02 Y:2021 Analyze flue gas for proper air/fuel ratio $14,321 $22,000
OK1064 #01 Y:2021 Use closed cycle process to minimize waste water production $9,509 $2,061
UF0572 #08 Y:2021 Use closed cycle process to minimize waste water production $5,635 $4,650
UF0572 #07 Y:2021 Install equipment (eg compactor) to reduce disposal costs $12,245 $11,975
UF0572 #06 Y:2021 Eliminate leaks in inert gas and compressed air lines/ valves $3,414 $756
UF0572 #05 Y:2021 Install occupancy sensors $4,007 $8,760
UF0572 #04 Y:2021 Turn off equipment during breaks, reduce operating time $4,152 $3,218
UF0572 #03 Y:2021 Install soft-start to eliminate nuisance trips $4,159 $10,627
UF0572 #02 Y:2021 Use demand controller or load shedder $27,950 $26,859
UF0572 #01 Y:2021 Use solar heat to make electricty $56,857 $359,360
SF0580 #07 Y:2021 Utilize controls to operate equipment only when needed $19,936 $49,917
SF0580 #06 Y:2021 Utilize energy-efficient belts and other improved mechanisms $228 $574
SF0580 #05 Y:2021 Recharge batteries on during off-peak demand periods $1,242 $2,702
SF0580 #04 Y:2021 Use adjustable frequency drive or multiple speed motors on existing system $13,463 $18,200
SF0580 #03 Y:2021 Modify refrigeration system to operate at a lower pressure $69,715 $64,882
SF0580 #02 Y:2021 Reduce space conditioning during non-working hours $12,288 $1,410
SF0580 #01 Y:2021 Use highest temperature for chilling or cold storage $18,446 -
LS2207 #05 Y:2021 Replace existing chiller with high efficiency model $136,185 $2,775,000
LS2207 #04 Y:2021 Use or replace with energy efficient substitutes $13,650 $158,575