ITAC Assessment: OK1064
ITAC logo
ITAC Assessment: OK1064
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Oil & Natural Gas Field Cable
NAICS 333132: Oil and Gas Field Machinery and Equipment Manufacturing
SIC 3533: Oil and Gas Field Machinery and Equipment
Sales Range $100
M
to 500
M
# of Employees 130
Plant Area 208,368
ft2
Annual Production 21,000
thousand feet
Production Hrs. Annual 8,760
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $341,212 6,437,972
kWh
Electricity Demand $202,851 15,026
kW-mo/yr
Electricity Fees $3,648 -
Natural Gas $74,053 25,018
MMBtu
Waste Disposal Costs
Water Usage $76,587 12,701
Tgal
TOTAL YEARLY COSTS $698,351
RECOMMENDED SAVINGS* $26,611 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,102

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Water Usage Savings
01 3.4111: Use closed cycle process to minimize waste water production $9,509 $2,061 - - $9,509
-
Tgal
02 2.1233: Analyze flue gas for proper air/fuel ratio $14,321 $22,000 - $14,321
-
MMBtu
-
03 2.1131: Repair faulty insulation in furnaces, boilers, etc $367 $700 - $367
-
MMBtu
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,414 $774 $2,414
45,538
kWh
- -
TOTAL RECOMMENDED $26,611 $25,535 $2,414
45,538
kWh
$14,688
-
MMBtu
$9,509
-
Tgal
TOTAL IMPLEMENTED $17,102 $23,474 $2,414
45,538
kWh
$14,688
-
MMBtu
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs